ERCOT operates the grid and wholesale market for most of Texas and publishes a large-load integration process. It is not a utility serving every Texas site. Treat submitted or studied load as a pipeline signal until project-level evidence supports approval, construction and energization.
Decision signals to watch
- Large-load process and requirement changes
- Site-specific study and transmission milestones
- Requested load versus approved service versus measured demand